Basement Project End of Week 8

Week 8 saw some window sills and riser trim installed and the first round of paint. Here’s how things are looking.

Week 8 saw some window sills and riser trim installed and the first round of paint.

Here’s how things are looking.

The Main Space

A photo of the main space of the basement. The ceiling has been painted a charcoal color and the walls are a gray color. A window is visible with an unfinished pine sill about a foot deep.

Another photo of the same main space from a different angle.

Another photo of the main space from a third angle. The window visible in this picture does not yet have a sill.

Another photo from a fourth angle. Another window is visible here with the same sill as that installed on the window in the first picture.

The Laundry

A photo of the laundry room. The walls and ceiling are painted just like the in the main space.

Another photo of the laundry room from a different angle. The visible HVAC duct is painted the same as the ceiling.

The Stairs

A photo of the stairs. The front of each step has trim installed.