Basement Project End of Week 7

Week 7 saw the finishing of the drywall, two of three doors installed, and some trim work.

Week 7 saw the finishing of the drywall, two of three doors installed, and some trim work.

Here’s how things are looking now.

The Main Space

A photo of the main space of the partially finished basement. Some baseboard trim has been installed along unpainted walls.

A photo of the same basement from a different angle. Partially visible is the newly installed door to the utility room.

Another photo of the same basement from a different angle. The newly installed laundry room door is visible from this angle.

Another photo of the same basement main room from a different angle.

The Laundry

A photo of the partially finished laundry room. Not much is noticeably different from this angle.

Another photo of the laundry room. From this angle the newly installed door is visible.

The Stairs

I’m adding pictures for the stairs, since none of the other angles are caputring them.

A photo of the partially finished stairs. They're rough framed with a some base trim along the sides.