A photo a partially finished basement. The angle is close to the ground and close to the camera is a wall corner with unpainted baseboard. In the background is a flight of unfinished stairs with some trim installed on the wall along the steps.

Basement project week 7 day 4: looks like some baseboard was installed as well as the trim alongside the stairs.