Landscape project before & after: looking at the sun porch from the driveway. Great space to hang out in now!
Landscape project week 7 day 4: the side steps are done! The swale to direct water across the front yard is also done, but it’s so subtle it just looks like a strip of disturbed dirt.
Landscape project week 7 day 3: the drainage and retention is all in place! They continued work on the side steps with slate chips and boulders.
Landscape project week 7 day 2: the side steps got some pavers in place and some grading done; the drainage is in place from the back yard to the front and a pit excavated for the dry wells; trenches for the piping from a front gutter to the retention system dug.
Landscape project week 6 day 4: the stairs and pavers are done! Work began again on the drainage along the side of the house with the final set of stairs placed, some grading, and excavation for pipes.