Two photos: the first is of some retaining wall steps with pavers for the top landing and a paver path in front. The second is of some stone treads and green pipe along a clay slope.

Landscape project week 6 day 4: the stairs and pavers are done! Work began again on the drainage along the side of the house with the final set of stairs placed, some grading, and excavation for pipes.