Two pictures: one of some stone steps with a drain pipe running alongside, the other of an area between a sun porch and a wall with black material laid and a few paver stones laid in the front corner.

Landscape project week 5 day 4: the landscapers started early and worked late today to get things in a good place before the rain starts. The drainage is installed to a point where work won’t get washed out (including some steps!), and the groundwork laid for the patio pavers.